Chapter Eleven
The Metaphysical Engineer's
Progress Report
1979
The Metaphysical Engineer's
Progress Report
1979
THE JEFFERSON HOTEL
OF RICHMOND VIRGINIA
Progress Report of Work
During 11-7 Shift
11:00 - Locked JEFFERSON ST. DOOR + Checked MAIN ST. DOOR.
11:21 - TURNED INTO A BELL HOP
11:28 - Changed BACK TO Engineer.
11:30 - Checked T.V. in 162. MADE PROPER ADJUSTMENTS.
11:45 - MADE SURE T.V. IN BASEMENT WAS WORKING TO PROPERLY. No programs after 2:45.
2:45
2:45 WROTE ALL of this DOWN and WONDERED why IN the
2:45 WROTE ALL of this DOWN and WONDERED why IN the
TO - HELL I'M STILL WORKING HERE.
3:25
3:30 CHECKED FLOORS. ALL LIGHT BULBS WERE Burning.
to -
4:15 MEDITATED ON the problems of the world.
to
6:00 Came to the conclusion that the problems of the world are SEX, GREED. MONEY. With that thought IN MIND I unlocked the JEFFERSON ST. DOOR.
6:30 - Cut on kitchen steam.
7:00 - ChecKED out after a very Busy nite.
HERE IS A PACK OF PALL
MALLS. Smoke them IN
GOOD HEALTH
Later
YOU know WHO Do not write in this space.